Welcome to the 3500 South Project Web Site 


Ribbon Cutting Event:   The 3500 South reconstruction and widening project is nearing substantial completion.  The Utah Department of Transportation and West Valley City cordially invite you to attend a ribbon-cutting ceremony to celebrate this event.
Please click the following link for event details:

Ribbon Cutting Invitation


Work Zone Safety Awareness Campaign:
UDOT and Granite Construction recently teamed to present a work zone safety awareness campaign to Drivers' Education classes at Granger High School.  The team instructed students on safe driving and pedestrian behavior in work zones.  The presentations also included a work zone signage module and testimonials from actual construction workers.  The team wishes to thank Principal Arthur Cox and Driver's Ed. instructor, Mike Folster, for coordinating the visits.  Following are student winners of the work zone signage contest.



MORE LANES, MORE OPTIONS: The Utah Department of Transportation (UDOT) and Utah Transit Authority (UTA) are joining forces to reduce congestion and provide more transportation options along the vital 3500 South corridor. Planned improvements include:

  • Widening the roadway to three travel lanes in each direction

  • Constructing dedicated Bus-Rapid-Transit (BRT) lanes in the center median

  • Replacing the asphalt with a new concrete surface

  • Installing new curb, gutter and sidewalk


  • Construction on 3500 South will take place in two sections:

  • Bangerter Highway to 2700 West: This section is fully designed and construction is underway.


  • 2700 West to Decker Lake Drive: Construction dates and funding for this section of 3500 South have not been determined. Before construction, a traffic study will be completed on the 3500 South/I-215 interchange to determine if any modifications should be made.


  • The following links contain frequently asked questions and their answers:

    Project Purpose and Features

    Construction Schedule

    Construction and Traffic

    Construction and Business

    Business Resources


    Bus Rapid Transit


    Other Projects and More Information


    Sign up for Email Updates

    A dedicated public information team is available to answer questions and keep you informed. Please visit this Web site from time to time to stay up to date or contact our team for further information.