About Layton Improved

Layton City and UDOT are working together to construct improvments at six locations in the Layton area in order to meet the city's unique traffic needs. Construction began Summer 2014. Click on the barrels for more information about each project.

Intersection Improvements; U.S. 89 at Antelope Drive Widening and Intersection Improvements; Hill Field Road Widening and Intersection Improvements; Antelope Drive Pavement Rehabilitation; S.R. 193 from I-15 to Hill Field Road I-15 Concrete Panel Replacement Roadway Reconstruction; U.S. 89 from S.R. 193 to Cornia U.S. 89; Oakhills to 200 N.
U.S. 89; Cherry Lane to Antelope Dr. Median Barrier
U.S. 89; Oak Hills to 200 N. Median Barrier
I-15 Concrete Panel Replacement; Complete
Title: Intersection Improvements; US. 89 at Antelope Dr.

Project Summary: The project includes connecting Antelope Drive to U.S. 89 and making it a new major intersection. The project also eliminates seven access points by constructing a new frontage road system that parallels U.S. 89. It also includes construction of a new Park & Ride lot.

Schedule: Proposed Construction Start Date June 2014
              Proposed Construction End Date October 2014

Project Alerts: None

Contact Info: Dave Asay, Public Involvement Manager
801.712.3030
dave@frontlinepi.com
http://www.udot.utah.gov/us89antelopedr/

Project Map:
U.S. 89; S.R. 193 to Corina Dr. Complete
Interchange and Intersection Improvements; Hill Field Road
Title: Interchange and Intersection Improvements; Hill Field Road

Project Summary: Thru Turns will be installed at the intersections of Hill Field and Main (West side) and Hill Field and Gordon Ave (East side). Left turn and through access at the mall (at Gordon Ave) will be restricted as well. Traffic from the mall will be spread across the other access points, aiding in the elimination of congestion so close to the interstate. An additional left turn lane will be added to the NB to WB turn lanes at Gordon Ave and Main Street on the west side. An additional lane will be added under the I-15 structures in each direction. The interchange at Hill Field Road will be reconstructed.

Schedule: Proposed Construction Start Date May 2015
              Proposed Construction End Date Fall 2016

Project Alerts: None

Contact Info: Aubry Bennion, Public Involvement Manager
801.904.4064
laytonimproved@utah.gov

Project Map:
Widening and Intersection Improvements; Antelope Drive
Title: Widening and Intersection Improvements; Antelope Drive

Project Summary: The project includes the addition of an additional through lane in both the eastbound and westbound directions between 2200 West and University Park Drive. This widening is accomplished by restriping and utilizing the existing shoulders.

Schedule: Construction Start Date February 2015
              Proposed Construction End Date May 2015

Project Update: Current Construction Activites

Contact Info: Aubry Bennion, Public Involvement Manager
801.904.4064
laytonimproved@utah.gov

Project Map:
Pavement Rehabilitation; S.R. 193 from I-15 to Hill Field Road
Title: Pavement Rehabilitation; S.R. 193 from I-15 to Hill Field Road

Project Summary: This project will reconstruct the pavement, improve drainage, and provide enhanced mobility and safety to S.R. 193 between the I-15 interchange and Hill Field Road.

Schedule: Currently in Planning and Development

Project Alerts: None

Contact Info: Aubry Bennion, Public Involvement Manager
801.904.4064
laytonimproved@utah.gov

Project Map: