News and Features

  • Visual Simulation at Hill Field Road
  • Thru Turn Overview and Tutorial
  • Top of Utah Transportation Expo
    Layton Improved will be in attendance at the Top Of Utah Transportation Expo on May 1, 2014, 4-7 p.m., at Weber State University. Click the link below for details.
  • Public Open House

    A Public Open House was held at the Davis Conference Center on Wednesday, January 29, 2014. The presentation material is available for viewing here.


  • Open House Presentation

About Layton Improved

Layton City and UDOT are working together to construct improvments at six locations in the Layton area in order to meet the city's unique traffic needs. Construction is scheduled to begin Summer 2014. Click on the barrels for more information about each project

Intersection Improvements; U.S. 89 at Antelope Drive Roadway Reconstruction; U.S. 89 from S.R. 193 to South Weber Drive/Cornia Drive Widening and Intersection Improvements; Hill Field Road Widening and Intersection Improvements; Antelope Drive Pavement Rehabilitation; S.R. 193 from I-15 to Hill Field Road Concrete Panel Replacement; I-15 from Hill Field Road to 200 South
Intersection Improvements; U.S. 89 at Antelope Drive
Title: U.S. 89; Antelope Drive Intersection Improvements

Project Summary: The project includes connecting Antelope Drive to U.S. 89 and making it a new major intersection. The project also eliminates seven access points by constructing a new frontage road system that parallels U.S. 89. It also includes construction of a new Park & Ride lot.

Schedule: Proposed Construction Start Date March 2014

Project Alerts: None

Contact Info: Dave Asay, Public Involvement Manager
801.712.3030
dave@frontlinepi.com
http://www.udot.utah.gov/us89antelopedr/

Project Map:
Roadway Reconstruction; U.S. 89 from S.R. 193 to South Weber Drive/Cornia Drive
Title: U.S. 89; S.R. 193 to Cornia Drive

Project Summary: The project includes rebuilding the northbound on-ramp from S.R. 193 to U.S. 89 to include double left-turn lanes from S.R. 193 to U.S. 89 and a new auxiliary lane running from S.R. 193 to South Weber Drive. It also includes construction of a new access road on the east side of U.S. 89 to eliminate several access points. This road serves a limited number of residents on the east side of U.S. 89.

Schedule: Proposed Construction Start Date April 2014

Project Alerts: None

Contact Info: Dave Asay, Public Involvement Manager
801.712.3030
dave@frontlinepi.com
Project Map:
Widening and Intersection Improvements; Hill Field Road
Title: Hill Field Road Improvements

Project Summary: Thru Turns will be installed at the intersections of Hill Field and Main (West side) and Hill Field and Gordon Ave (East side). Left turn and through access at the mall (at Gordon Ave) will be restricted as well. Traffic from the mall will be spread across the other access points, aiding in the elimination of congestion so close to the interstate. An additional left turn lane will be added to the NB to WB turn lanes at Gordon Ave and Main Street on the west side. An additional lane will be added under the I-15 structures in each direction.

Schedule: Proposed Construction Start Date July 2014

Project Alerts: None

Contact Info: Aubry Bennion, Public Involvement Manager
801.904.4064
laytonimproved@utah.gov

Project Map:
Widening and Intersection Improvements; Antelope Drive
Title: Antelope Drive Improvements

Project Summary: The project includes the addition of an additional through lane in both the eastbound and westbound directions between 2200 West and University Park Drive. This widening is accomplished by restriping and utilizing the existing shoulders.

Schedule: Proposed Construction Start Date September 2014

Project Alerts: None

Contact Info: Aubry Bennion, Public Involvement Manager
801.904.4064
laytonimproved@utah.gov

Project Map:
Pavement Rehabilitation; S.R. 193 from I-15 to Hill Field Road
Title: S.R. 193; I-15 to Hill Field Road

Project Summary: This project will reconstruct the pavement, improve drainage, and provide enhanced mobility and safety to S.R. 193 between the I-15 interchange and Hill Field Road.

Schedule: Proposed Construction Start Date April 2014

Project Alerts: None

Contact Info: Aubry Bennion, Public Involvement Manager
801.904.4064
laytonimproved@utah.gov

Project Map:
Concrete Panel Replacement; I-15 from Hill Field Road to 200 South
Concrete Panel Replacement; I-15 from Hill Field Road to 200 South

Project Summary: This project will extend the life of the pavement or bridge deck. By completing this project UDOT is able to preserve Utah's infrastructure by applying cost effective treatments before major rehabilitation is required.

Schedule: Proposed Construction Start Date May 2014

Project Alerts: None

Contact Info: T. Patrick Cowley
801.620.1685
patrickcowley@utah.gov

Project Map: