EWC logo

East-West Connector Environmental Study


Document Index

Click on a chapter or appendix below to open that file.


Chapters

Cover and Contents

Environmental Study Documentation

1 – Purpose of and Need for the East-West Connector Project

2 – Alternatives

3 – Affected Environment

4 – Environmental Consequences

5 – Additional Project Information

6 – Glossary

Appendices

A – Preliminary Plan Sheets for the East-West Connector

B – Air Quality Hot-Spot Analysis

C – Agency Coordination and Public Involvement Summary

How To Comment

The Utah Department of Transportation (UDOT) welcomes your comments on this Environmental Study. Comments on the East-West Connector project can be submitted at any time, but comments specifically on this Environmental Study must be received no later than April 18, 2008. There are five ways to comment on the Environmental Study:

East-West Connector Project
Attn: Sue Lee
HDR Engineering, Inc.
3995 South 700 East, Suite 100
Salt Lake City, UT 84107
  • Give your comment at the open house/public meeting on April 10.
Snow Springs Elementary School
850 South 1700 West, Lehi (map)
April 10, 2008
5:00 PM to 7:00 PM

Adobe Reader

Download Adobe Reader

This electronic document was created in portable document format (PDF). If you can't open the document files, you will need to install Adobe Reader, which can be downloaded free from the Adobe web site.

System Requirements

  • Adobe Reader version 7.0 or higher
  • 256 MB RAM

Additional Copies

For additional copies of this CD, contact:

HDR Engineering, Inc.
3995 South 700 East, Suite 100
Salt Lake City, UT 84107
(801) 743-7800
Carrie.Ulrich@hdrinc.com