<rss version="2.0">
  <channel>
    <title>UDOT Web site Recent Updates</title>
    <link>http://www.udot.utah.gov/main/f?p=100:pg:0::::V,T:,1</link>
    <description>This is a feed of Utah Dept of Transportation&apos;s recent updates.</description>
    <language>en-us</language>
    <item>
      <title>Bangerter Highway at 13400 South, CFI</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:3785,62220</link>
      <description>UDOT is proposing to make roadway improvements to address current and future congestion, traffic delays, and resulting safety problems at the intersection of Bangerter Highway and 13400 South. A Draft Categorical Exclusion (CE) has been prepared which assess the project&amp;rsquo;s effects on the quality of human health and the environment in accordance with the provisions of the National Environmental Policy Act of 1969. &lt;a href=&quot;http://www.udot.utah.gov/main/uconowner.gf?n=8395729830907190&quot; target=&quot;_new&quot;&gt;The Draft CE is available by clicking here&lt;/a&gt;. (4.4MB PDF File)</description>
    </item>
    <item>
      <title>02/10/2012 -- UDOT Region One Road Construction Report for February 10-16, 2012</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:64,62219</link>
      <description>&lt;strong&gt;Ogden-- The Utah Department of Transportation (UDOT) advises motorists of the following road construction and maintenance activities that may cause traffic impacts in the state&amp;#39;s Northern Region:&lt;/strong&gt;</description>
    </item>
    <item>
      <title>Bangerter South</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:3049,62217</link>
      <description>&lt;strong&gt;Traffic Impacts: &lt;/strong&gt;Current traffic impacts from this project can be obtained by selecting Know Where Know Why above or by visiting the project website.</description>
    </item>
    <item>
      <title>Avalanche Work Planned</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:1672,62216</link>
      <description>&lt;p&gt;&lt;u&gt;&lt;strong&gt;ATTENTION&lt;/strong&gt;&lt;/u&gt;&amp;nbsp;&lt;/p&gt;&lt;p&gt;&lt;strong&gt;February 9,2012&lt;/strong&gt;&lt;/p&gt;&lt;p&gt;&amp;nbsp;&lt;/p&gt;&lt;p&gt;&lt;strong&gt;UDOT&amp;nbsp;plans to&amp;nbsp;conduct&amp;nbsp;artillery&amp;nbsp;firing in&amp;nbsp;Little Cottonwood Canyon&amp;nbsp;on Friday, February 10, 2012 beginning at 11:00 am.&amp;nbsp; A closure is in effect on all areas north of the canyon road from&amp;nbsp;Closure Gate B&amp;nbsp;to&amp;nbsp;Closure Gate D&amp;nbsp;until&amp;nbsp;1:00 p.m.&amp;nbsp;on February 10, 2012.&amp;nbsp;&amp;nbsp;&lt;/strong&gt;&lt;/p&gt;&lt;p&gt;&lt;strong&gt;This message may change so check for updates. &lt;/strong&gt;&lt;/p&gt;&lt;p&gt;&lt;strong&gt;Thanks&lt;/strong&gt;&lt;/p&gt;</description>
    </item>
    <item>
      <title>Pedestrian Access Ramp Evaluation Form - ADA 2011</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=9863415022400373</link>
      <description>66KB PDF File</description>
    </item>
    <item>
      <title>SELECTION NOTIFICATION</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:614,62209</link>
      <description>Consultant Services LOI, RFP, and RFQ Selection Results</description>
    </item>
    <item>
      <title>Project Advertising Checklists (February 9, 2012)</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:3701,62205</link>
      <description/>
    </item>
    <item>
      <title>Risk Assessment Checklist</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=7566727949712888</link>
      <description>&lt;p&gt;Updated February 9, 2012&lt;/p&gt;</description>
    </item>
    <item>
      <title>Employee Directory</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=8580626550252900</link>
      <description/>
    </item>
    <item>
      <title>Project Design Criteria (PDC Form)</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=8576432241715295</link>
      <description>&lt;p&gt;Updated February 9, 2012&lt;br /&gt;(Check periodically for updates)&lt;/p&gt;&lt;ul&gt;&lt;ul&gt;&lt;li&gt;&lt;div&gt;UDOT has revised its Project Design Criteria form to be consistent with the AASHTO 2011 Policy on Geometric Design of Highways and streets. &lt;/div&gt;&lt;/li&gt;&lt;/ul&gt;&lt;/ul&gt;</description>
    </item>
    <item>
      <title>Fatal Crash Graphs</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=8551811930276378</link>
      <description>89.3 KB PDF File</description>
    </item>
    <item>
      <title>Traffic Fatality Comparison Chart</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=8551624266270506</link>
      <description>402 KB PDF File</description>
    </item>
    <item>
      <title>02/08/2012 -- UDOT using temporary thru turn to reduce traffic impacts during construction of new interchange on Bangerter Highway</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:64,62197</link>
      <description>&lt;strong&gt;SALT LAKE CITY &amp;ndash; The Utah Department of Transportation (UDOT) will implement a temporary &amp;ldquo;ThrU Turn&amp;rdquo; on Bangerter Highway at 7800 South this weekend to reduce impacts during construction of a new interchange. The ThrU Turn design will redirect left turns away from the intersection while reducing congestion and improving safety for commuters and construction crews. Motorists traveling northbound or southbound on Bangerter who want to turn left at the 7800 South intersection will travel through the main intersection, make a U-turn at a signal controlled location, and come back to the intersection from the opposite direction to turn right. Movements for eastbound and westbound along 7800 South traffic will remain the same.&lt;/strong&gt;</description>
    </item>
    <item>
      <title>02785M, Chip Seal Coat</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=8550429620158522</link>
      <description>&lt;p&gt;Added back February 8, 2012 (accidently deleted)&lt;/p&gt;&lt;p&gt;&lt;strong&gt;(Use for both 2008 and 2012 Standards Projects)&lt;/strong&gt;&lt;/p&gt;</description>
    </item>
    <item>
      <title>Maintenance Organizational Chart</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=3413609885091529</link>
      <description>71.9KB PDF File</description>
    </item>
    <item>
      <title>Contact Us</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:284,62192</link>
      <description>&lt;p&gt;UDOT Geotechnical Section Contact Information&lt;br /&gt;&lt;br /&gt;Physical Address:&lt;br /&gt;4501 South 2700 West, Salt Lake City, Utah 84119&lt;/p&gt;&lt;p&gt;Mailing Address:&lt;br /&gt;Box 148405, Salt Lake City, Utah 84114-8405&lt;br /&gt;&lt;br /&gt;How Can We Serve You Better? Send an email with your comments relating to Geotechnical business or web content to Leslie Peterson at &lt;a href=&quot;mailto:lpeterson@utah.gov&quot;&gt;lpeterson@utah.gov&lt;/a&gt;.&lt;/p&gt;</description>
    </item>
    <item>
      <title>13400 South, Bangerter Highway to Mountain View Corridor</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:3784,62191</link>
      <description>&lt;p&gt;Riverton City and UDOT have selected Wadsworth Brothers Construction to reconstruct 13400 South.&amp;nbsp; The final result of this reconstruction will be:&lt;br /&gt;&lt;br /&gt;- A wider roadway with three travel lanes in each direction&lt;br /&gt;- A concrete driving surface&lt;br /&gt;- Shoulders, curb and gutter&lt;br /&gt;- Sidewalks&lt;br /&gt;- A reconfigured intersection at 4150 West&lt;br /&gt;- Improved street lighting and traffic signals&lt;br /&gt;- Improved drainage conditions&lt;br /&gt;&lt;br /&gt;Reconstruction activities are scheduled to begin early to mid-February and continue through late Summer of 2012.&amp;nbsp; Construction activities are expected to occur Monday through Saturday from 7 am to 6 pm.&amp;nbsp; Residents, businesses and commuters can expect lane restrictions, reduced speeds, noise and vibration during this time.&amp;nbsp;&lt;br /&gt;&lt;br /&gt;&lt;strong&gt;&lt;u&gt;Weekly Email Updates&lt;/u&gt;&lt;/strong&gt;&lt;br /&gt;Sign up to receive weekly construction emails by emailing &lt;a href=&quot;mailto:134thReconstructionandCFI@utah.gov&quot;&gt;134thReconstructionandCFI@utah.gov&lt;/a&gt;&lt;br /&gt;&lt;br /&gt;&lt;strong&gt;&lt;u&gt;Public Information Team&lt;/u&gt;&lt;/strong&gt;&lt;br /&gt;Project Hotline:&amp;nbsp; 888-556-0232&lt;br /&gt;Email:&amp;nbsp; &lt;a href=&quot;mailto:134thReconstructionandCFI@utah.gov&quot;&gt;134thReconstructionandCFI@utah.gov&lt;/a&gt; &lt;br /&gt;Website: &amp;nbsp;&lt;a href=&quot;http://www.udot.utah.gov/main/f?p=100:pg:0:::1:T,V:3784&quot;&gt;http://www.udot.utah.gov/main/f?p=100:pg:0:::1:T,V:3784&lt;/a&gt;,&lt;/p&gt;</description>
    </item>
    <item>
      <title>02077S, Geogrids</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=8550727112176683</link>
      <description>&lt;p&gt;Updated December 14, 2009 (Added back February 8, 2012. Accidently removed.)&lt;/p&gt;&lt;p&gt;&lt;strong&gt;(Use for both 2008 and 2012 Standards Projects)&lt;/strong&gt;&lt;/p&gt;</description>
    </item>
    <item>
      <title>2010 Right of  Way and Local Government Pool</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:675,62187</link>
      <description/>
    </item>
    <item>
      <title>***Project No. S-0193(6)0, PIN 8021, SR-193 Extension, 2000 West to I-15 in Davis County - Project Controls Specification Summary</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=8520719145780963</link>
      <description>Added February 7, 2012&lt;br /&gt;Information file for project</description>
    </item>
    <item>
      <title>***Project No. S-0193(6)0, PIN 8021, SR-193 Extension, 2000 West to I-15 in Davis County - Project Plan</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=8520508063777723</link>
      <description>Added February 7, 2012&lt;br /&gt;Information file for project</description>
    </item>
    <item>
      <title>***Project No. S-0193(6)0, PIN 8021, SR-193 Extension, 2000 West to I-15 in Davis County - Flyer</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=8520328364774085</link>
      <description>Added February 7, 2012&lt;br /&gt;Information file for project</description>
    </item>
    <item>
      <title>PROJECT ADVERTISEMENT</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:614,62174</link>
      <description>&lt;p&gt;One new Modified Standard RFQ posted&amp;nbsp;February 6, 2012&lt;/p&gt;&lt;p&gt;&lt;strong&gt;&lt;u&gt;RFP/RFQ Information Follows&lt;/u&gt;&lt;/strong&gt;&lt;/p&gt;</description>
    </item>
    <item>
      <title>Project No. S-0193(6)0, PIN 8021, SR-193 Extension, 2000 West to I-15 in Davis County - Modified Standard RFQ</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=8500215171950210</link>
      <description>&lt;p&gt;Added February 6, 2012&lt;br /&gt;View information for Request for Qualifications&lt;/p&gt;&lt;p&gt;Refer to the below three informational files for this project.&lt;/p&gt;</description>
    </item>
    <item>
      <title>C103: (2012 Spec) Cost Analysis/Itemized Statement (Excel)</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=8488825917684336</link>
      <description/>
    </item>
    <item>
      <title>I-15, North Holden to Scipio</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:3558,62161</link>
      <description>&lt;p&gt;&lt;strong&gt;Project Schedule:&lt;/strong&gt;&lt;/p&gt;&lt;p&gt;Design: Currently under way&lt;/p&gt;&lt;p&gt;Bid Advertisement: Spring 2012&lt;/p&gt;&lt;p&gt;Construction: Summer 2012&lt;/p&gt;</description>
    </item>
    <item>
      <title>Recommended Change File</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=13162726386829258</link>
      <description>Added February 2, 2012 for 2012 Standards&amp;nbsp; &lt;ul&gt;&lt;ul&gt;&lt;li&gt;Use this file to submit suggestions.&lt;/li&gt;&lt;/ul&gt;&lt;/ul&gt;</description>
    </item>
    <item>
      <title>Summary of Recommended Standard Drawing Book Changes</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=8482115305864776</link>
      <description>Updated February 2, 2012&lt;br /&gt;Applies for 2012 Standards</description>
    </item>
    <item>
      <title>Summary of Recommended Standard Specification Book Changes</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=8481910832740518</link>
      <description>Updated February 2, 2012&lt;br /&gt;Applies for 2012 Standards</description>
    </item>
    <item>
      <title>S.R.  14 Landslide Repair</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:3571,62157</link>
      <description/>
    </item>
    <item>
      <title>Region Three Contacts (Juab, Utah, Wasatch, Duchesne, Daggett and Uintah Counties)</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:672,62156</link>
      <description>Region Three&lt;br /&gt;658 North 1500 West&lt;br /&gt;Orem, Utah 84057&lt;br /&gt;&lt;br /&gt;Region Three covers Juab, Utah, Wasatch, Duchesne, Daggett and Uintah Counties</description>
    </item>
    <item>
      <title>Warranted Signal List</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=8463109232332541</link>
      <description>49KB PDF File</description>
    </item>
    <item>
      <title>Operations Organization Chart</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=3413801667145966</link>
      <description>73KB PDF File</description>
    </item>
    <item>
      <title>Mineral Lease Fund Distributions</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:135,62151</link>
      <description/>
    </item>
    <item>
      <title>Special Provisions, Project Advertising Checklists, and Specification Writers&apos; Guide (February 1, 2012)</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:3701,62149</link>
      <description/>
    </item>
    <item>
      <title>00515M - Contract Award and Execution (Use for 2012 Standards Projects only)</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=8048412901089006</link>
      <description>Updated February&amp;nbsp;1, 2012</description>
    </item>
    <item>
      <title>00120M - Bidding Requirements and Conditions</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=8414906690180516</link>
      <description>Added February&amp;nbsp;1, 2012&lt;br /&gt;Use on all 2012 Projects</description>
    </item>
    <item>
      <title>00515M - Contract Award and Execution</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=8435507635891135</link>
      <description>&lt;p&gt;Added February 1, 2012&lt;br /&gt;&lt;strong&gt;(For use on all projects.)&lt;/strong&gt;&lt;/p&gt;&lt;p&gt;Refer to below Helpful Links&amp;nbsp;for Price + Time version&lt;/p&gt;</description>
    </item>
    <item>
      <title>Flagger Training Handbook</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=8349515552476979</link>
      <description>2.06&amp;nbsp;MB PDF&amp;nbsp;File</description>
    </item>
    <item>
      <title>What&apos;s New and Changed for the 2012 Standards (January 1, 2012)</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:3701,62142</link>
      <description/>
    </item>
    <item>
      <title>Standard Specification List of Changes</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=8415518942193536</link>
      <description/>
    </item>
    <item>
      <title>All Checklist Files</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=8414419569014002</link>
      <description>&lt;p&gt;Updated January&amp;nbsp;31, 2012&lt;/p&gt;</description>
    </item>
    <item>
      <title>2012 Edition - Specification Writers&apos; Guide</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:719,62137</link>
      <description>&lt;p&gt;&lt;strong&gt;New&amp;nbsp;version for 2012. Replaces the 2008 version.&lt;br /&gt;&lt;/strong&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Use with 2012 edition of the UDOT Standard Specifications for Road and Bridge Construction,&amp;nbsp;Supplemental Specification, and Special Provisions.&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;The attached Specification Writers&amp;#39; Guide provides guidance on organization, formatting, abbreviations, acronyms, symbols, numbers, words, capitalization, lists, tables, forms, wording (active voice), and other suggestions, helpful hints, and examples for use with the 2008 edition, Standard Specifications, Supplemental Specifications, and Special Provisions.&lt;/p&gt;</description>
    </item>
    <item>
      <title>UDOT Advertising Checklist</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=7561903981750380</link>
      <description>&lt;p&gt;Updated January&amp;nbsp;31, 2012&lt;/p&gt;</description>
    </item>
    <item>
      <title>Schedule for Planning (2012)</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:661,62130</link>
      <description>&lt;p&gt;Specifications, drawings, and submittal sheets with supporting information are due to the Standards and Specifications Section on the &amp;quot;Agenda Items Due&amp;quot; date.&lt;/p&gt;&lt;p&gt;&lt;strong&gt;Standards Committee meeting time&amp;nbsp;8:30 a.m. - noon.&lt;/strong&gt;&lt;/p&gt;&lt;p&gt;MEETING SCHEDULE&lt;/p&gt;</description>
    </item>
    <item>
      <title>Previous Meetings (2011)</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:661,62128</link>
      <description>&lt;p&gt;2011 MEETING SCHEDULE&lt;/p&gt;</description>
    </item>
    <item>
      <title>No Avalanche Work Planned</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:1672,62127</link>
      <description>There is currently no avalanche control work planned in Big or Little Cottonwood Canyons or Provo Canyon.</description>
    </item>
    <item>
      <title>Project No. F-LC03(15), PIN 8618, Malad River Bridge, Box Elder County - Streamlined RFQ</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=8366225042142490</link>
      <description>&lt;p&gt;Added January 30, 2012 &lt;strong&gt;(Revised January 30, 2012)&lt;br /&gt;&lt;/strong&gt;View information for Request for Qualifications&lt;/p&gt;&lt;ul&gt;&lt;ul&gt;&lt;li&gt;Revision Page 17 to change 2008 Standards to 2012 Standards&lt;/li&gt;&lt;/ul&gt;&lt;/ul&gt;</description>
    </item>
    <item>
      <title>2012 Standard Specification and Standard Drawing Contact Information</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:524,62122</link>
      <description/>
    </item>
    <item>
      <title>Approved Products List</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:239,62119</link>
      <description/>
    </item>
    <item>
      <title>List of NPEP Members</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:239,62118</link>
      <description/>
    </item>
    <item>
      <title>Standard Specification and Standard Drawing Contacts</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=8386201294396772</link>
      <description>Added January&amp;nbsp;30, 2012</description>
    </item>
    <item>
      <title>I-15 Utah County Corridor Expansion</title>
      <link>http://www.udot.utah.gov/main/f?p=100:pg:::::T,V:2161,56820</link>
      <description>&lt;p&gt;&lt;strong&gt;Project Web site: &lt;a href=&quot;http://www.udot.utah.gov/i15core&quot; target=&quot;_new&quot;&gt;www.udot.utah.gov/i15core&lt;/a&gt;&lt;/strong&gt;&lt;/p&gt;&lt;p&gt;&lt;strong&gt;Project Location:&lt;/strong&gt;&amp;nbsp; From Lehi Main Street to Spanish Fork Main Street&lt;/p&gt;&lt;p&gt;&lt;strong&gt;Project Schedule:&lt;/strong&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;January 2010 - Design and Pre-construction Begins&lt;/li&gt;&lt;li&gt;Spring 2010 - Construction Begins&lt;/li&gt;&lt;li&gt;June 2012 - Scheduled Phase 1 Completion (Lehi Main Street to Pleasant Grove)&lt;/li&gt;&lt;li&gt;December 2012 - Scheduled Phase 2 Completion (Pleasant Grove to Spanish Fork)&amp;nbsp;&lt;br /&gt;&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;&lt;br /&gt;&lt;strong&gt;Project Overview:&lt;/strong&gt;&amp;nbsp;I-15 CORE expands the freeway by two lanes in both directions from Lehi Main Street to Spanish Fork Main Street; extends the express lane from University Parkway in Orem to Spanish Fork; rebuilds and reconfigures 10 freeway interchanges; replaces and restores 55 bridges; and provides additional improvements that will meet or exceed travel demands through the year 2030 including using 40-year concrete pavement along the entire corridor.&lt;/p&gt;&lt;p&gt;I-15 CORE is needed to alleviate traffic congestion, support economic development, increase safety and accommodate additional population growth. Since 2000, Utah County has been among the top 10 fastest -growing counties in the state. The Governor&amp;#39;s Office of Planning and Budget estimates this growth trend will likely continue into 2060.&lt;/p&gt;&lt;p&gt;&lt;strong&gt;Traffic Impacts:&lt;/strong&gt;&amp;nbsp;Please visit the project Web site for current traffic impacts and suggestions on how to &lt;a href=&quot;http://travelwise.utah.gov&quot; target=&quot;_new&quot;&gt;TravelWise&lt;/a&gt; and ease construction delays for everyone.&lt;/p&gt;</description>
    </item>
    <item>
      <title>Temporary Oversize/Overweight Construction Restrictions</title>
      <link>http://www.udot.utah.gov/main/uconowner.gf?n=8148119837027294</link>
      <description>54&amp;nbsp;kb</description>
    </item>
  </channel>
</rss>

