2013 Projects

Concrete Repair Project: I-80; 6000 West to Saltair

Construction Timeline
Summer 2013
Project Overview
Construction crews are repairing concrete on the mainline of I-15 from 6000 West to Saltair and all on- and off-ramps between those areas. Work will take place during daytime and nighttime hours, and will require lane closures to allow crews to complete repairs and improvements. The project will extend the life of the roadway surface, improve safety and provide a smoother ride for drivers. This work is scheduled for the 2013 construction season.

I-80; Overhead VMS/Curve Warning Sign

Construction Timeline
February 2013
Project Overview
UDOT is installing an overhead VMS/curve warning message sign on eastbound I-80 between Redwood Road and I-15 in Salt Lake City, which will warn drivers about the curve near the I-15 Junction and improve safety for the traveling public.

Culvert Project: I-80; Mouth of Parley’s Canyon

Construction Timeline
Summer 2013
Project Overview
Construction crews are installing a new drainage system along I-80 at the mouth of Parley’s Canyon to service all of Salt Lake City’s overflow needs and the canyon drainage. This work will require shoulder closures, nighttime lane closures and occasional daytime lane closures.

Resurfacing Project: I-80; Atkinson Canyon

Construction Timeline
Summer 2013
Project Overview
UDOT will repave I-80 this summer near Atkinson Canyon. The project will extend the life of the roadway surface and provide a smoother ride for drivers.

Resurfacing Project: I-80; Coalville to Echo

Construction Timeline
Summer 2013
Project Overview
UDOT will repave I-80 this summer from Coalville to Echo. The project will extend the life of the roadway surface and provide a smoother ride for drivers.

Bridge Replacement: I-80; Mile Post 119

Construction Timeline
Summer 2013
Project Overview
Construction crews are replacing a bridge on I-84 near the Echo interchange.