Past Projects

Resurfacing Project: I-80 Milepost 10-20

Construction Timeline: September 8 through end of September
Project Overview:

UDOT resurfaced I-80 between milepost 10.46 and 20. This project will preserve Utah’s infrastructure by applying cost effective treatments before major rehabilitation is required. The preservation efforts included the resurfacing of the roadway and sealing cracks, improving ride quality and increasing skid resistance. Construction began in September 2015.