Reconstruction Project: I-80 Silver Creek to Wanship (MP 148 – 155)

Construction Timeline: June 9 2014 – October 2015
Project Overview:

UDOT reconstructed I-80 between Silver Creek junction and Wanship. The project took place over a period of two years. Crews reconstructed eastbound lanes in 2014 and westbound lanes in 2015. Traffic was be shifted to the opposite side of the road during construction, creating one lane of travel in each direction. Drivers were advised to plan ahead for delays and use alternate routes as necessary. This project will prolong the life of the roadway and enhance safety for the traveling public..