Past Projects

Concrete Repair Project: Near Stansbury/Tooele Exit 99

Construction Timeline: May 27 – early July
Project Overview:

UDOT repaired concrete at various locations on I-80 between MP 99 and MP 94. This project provides a smoother ride and prolongs the life of the roadway.