Telegraph Street

SR-212; Telegraph Street
Environmental Assessment

Overview: Project Web site: www.udot.utah.gov/telegraphstreet

Study Name: SR-212, Telegraph Street Environmental Assessment (EA)

Project Study Area Limits: The project study area encompasses 100 North to 100 South and 500 West to 300 East in Washington City.

Study Schedule: October 2005 - December 2006

Public and Agency Input: Throughout Project
Development of Purpose and Need: January - February 2006
Development and Screening of Alternatives: February - August 2006
Draft Environmental Assessment: February - August 2006
Preparation of Final EA: October - December 2006

Overview: In March of 2005, a Concept Report was completed for Telegraph Street, between 500 West and 300 East in Washington City. This Concept Report accomplished the following:

· Defined and validated the project Purpose and Need
· Identified key environmental and community issued that need to be considered as the project is developed
· Assessed existing conditions along the project corridor
· Conducted a Preliminary Environmental Review
· Proposed and studied three design concepts
· Developed cost estimates for those design concepts
· Identified and recommended the level of environmental documentation that this project will require
· Developed a draft public involvement plan to be used in the development of this project

As a result, a comprehensive EA is being undertaken to look at the broader issues associated with transportation needs in the study area. The goal of this EA is to develop a purpose and need for the project, alternatives that support the purpose and need, and to select an alternative that will best meet the purpose and need. The NEPA process will be directed through a public involvement process to develop consensus with the stakeholders involved.

Contact Info: Telegraph Street Project Team, 1-800-997-8770, telegraphstreet@urscorp.com

Link: www.udot.utah.gov/telegraphstreet