Construction and Long-Term Stormwater Management

Construction Stormwater Management
UDOT complies with the statewide General Permit for Discharges from Construction Activities (UPDES Permit Number UTRC00000)
The UDOT Stormwater Pollution Prevention Plan (SWPPP)
describes the activities designed to reduce the discharge of pollutants from construction sites.
The MS4 Compliance Plan
projects under an acre of earth disturbance ensuring compliance with Best Management Practices (BMPs) preventing discharges of pollutants associated with construction activity from the UDOT right-of-way
Stormwater Pollution Prevention Plan (SWPPP)
Appendix C – UDOT Spill Prevention and Response Plan for Construction Sites
Appendix D – Utah General Stormwater Discharge Permit for Construction Activities
Appendix F – UDOT SWPPP Background & NOT Form
Appendix F – UDOT SWPPP Inspection Form
Appendix F – Final NOT Inspection
Appendix G – UDOT Enforcement Action Log
Utah Annual Precipitation Map
Procedural Standard Operating Procedures (SOPs)
Design and Pre-Construction Phase SOP – 7/09/2020
Notice of Intent SOP – 7/31/2018
Pre-Land Disturbance Inspection SOP – 8/8/2018
SWPPP Weekly Oversight Inspection SOP – 7/09/2020
Follow-Up Inspection SOP – 7/31/2018
Enforcement Procedures SOP – 7/31/2018
Notice of Termination SOP – 7/09/2020
MS4 Compliance Plan SOP and Template – October 2022 (Download/Open for Fillable pdf)
Operational Standard Operating Procedures (SOPs)
Utah DEQ Stormwater Permit Issuance System
Long-Term Stormwater Management
LTSWM Training Resources
Long-Term Stormwater Management Training — Presentation Slides
Long Term Stormwater Management Training — Script

- For use with the UDOT Stormwater
Quality Design Manual
Modified from NCHRP Project 25-41
21MB XLSM File
Posted March 31, 2021
- 4129K PDF file
Updated May 2021
UDOT Stormwater Quality Design Quick Guide
- 178K PDF file
Updated May 2021
UDOT Stormwater Design Documentation Template
- 36KB DOCX File
Posted July 2021
- Select
“Open in ArcGIS Online”
bottom right of page