Construction is complete between Rockcliff and Kamas. Drainage improvements were installed from 200 North to approximately 500 North in Kamas to reduce flooding and hydroplaning. Shoulder widening was followed by a mill and new overlay of the roadway surface. These efforts were done to stabilize shoulders, extend the life of the pavement, and provide a smoother driving surface.
Construction is complete.