UDOT resurfaced S.R. 68, from MP 11 to MP 14.6 by removing and replacing the top layer of asphalt. Some shoulder improvements and the installation of center rumble strips were also included as a part of this project.
As a result, the life of the pavement has been extended for several years, and the driving experience along the corridor has been improved.