Asphalt resurfacing and shoulder repair on SR-150; High School to Samak (MP 0.4 to MP 6.1). Project efforts also included shoulder repair, new paint and striping. This project will preserved Utah's infrastructure by applying cost effective treatments before major rehabilitation was required. The preservation efforts included the resurfacing of the roadway to improve ride quality and increase skid resistance.
This project has been completed.