UDOT, in partnership with Summit County, is preparing an Area Plan to develop and execute existing and future transportation solutions at the I-80 and S.R. 224 interchange and through the two at-grade traffic signals on S.R. 224 at Ute Boulevard and Olympic Parkway, which are close to the interchange.
The focus of the study is to:
The process will involve the following steps:
Project impacts to travel can be found on the UDOT Traffic website, www.udot.utah.gov/traffic.
Kevon Ogden (801) 910-2100 kevonogden@utah.gov