Construction is complete on SR-224 from SR-248 to Bear Hollow Drive. This project milled 3” of the existing pavement and replaced with 3” of new asphalt. A top coat of 1” was added to finish the surface. Pedestrian ramps are in the process of being upgraded at approximately 5 locations. As a follow up to last year’s drainage work, one pipe was lined near White Pines Canyon Road.
The project created a smoother surface for the traveling public while preserving the roadway section. This is routine maintenance that takes place every 5-7 years.