The Utah Department of Transportation (UDOT), in conjunction with the City of St. George, is constructing a pedestrian tunnel that will run under Bluff Street between Main Street and the I-15 southbound ramps. The tunnel will connect the east and west sides of the Hilton Drive Trail giving users a safe connection across Bluff Street, avoiding the busy Main Street traffic signal. Construction is anticipated to begin summer 2021 and last through the fall.
Project impacts to travel can be found on the UDOT Traffic website, www.udot.utah.gov/traffic.
Hotline: (435) 216-0096 Email: bluffpedtunnel@utah.gov