This project begins at 400 North and ends at SR-128. It will reconstruct the existing roadway to accommodate five lanes of traffic, two thru lanes in each direction with a two way left turn lane and 6-foot shoulders. For most of the project, there will be a center turn lane. Where we cannot provide a center turn lane, there will be two lanes in each direction with a painted double yellow line separating traffic. The project will also add curb, gutter, and sidewalk on the west side of US-191 from Motel 6 to the Colorado River Bridge. In addition, UDOT will partner with Moab City to construct a Storm Water Waste System to address storm water from rain events starting at Stewart Canyon area, above Cermak Drive. The system will collect storm water from Stewart Canyon, US-191 and adjacent properties, depositing the water in a collection pond west of the intersection at 500 West and US-191. The re-evaluation of the environmental document has been completed, UDOT anticipates advertising for construction in September 2019 and some elements of construction could begin in the Fall of 2019.
For a review of the information that was presented at the previous open house, please go to the DOWNLOADS link on the menu bar above, or click here Past Open House Information
Project Information
Scott Henriksen (800) 948-8286 shenriksen@utah.gov
Project Manager
Ryan L Anderson (435) 633-5095 rlanderson@utah.gov